MoreExam
1. Question Content...
EXPLANATION
Answer: X - EXPLANATION Content.
Question1: An architect is designing a vSphere 6.5 implementation.The customer requires Cross vCenter vMotion for the newly-created data centers in New York andHoustonEach data center will use different IP networks for management and vMotionWhen creating a vMotion network, which two statements are required in order to use Cross vCenter Server vMotion? (Choose two.)
Question2: The customer has two sites that must operate independently of each other in the event of a WAN failure.During normal operations, administrators from each site must be able to manage the other site through the vSphere Web Client.Which vCenter Server Appliance (VCSA) and Platform Services Controller (PSC) diagram shows the VMware-recommended design that satisfies these requirements?A:B:C:D:
Question3: A company is consolidating its IT operations efforts by moving the Finance, IT, and QA departments towards a self-service environment, following SDDC best practices.All departments have different priorities and expectations for uptime of the required infrastructure andapplicationsProject stakeholders are still discussing final approvals for the budget with the CFO.To drive down the operating cost of the environment, only blade servers will implement this project.To ensure business continuity, a colocation provider was chosen to fail over virtual machines.The implementation of the project will follow a public reference architecture provided by VMware.What is the assumption in this scenario?
Question4: A company has requested that a new vSphere 6,5 design be created.The existing environment consists of 32 vSphere 6.0 hosts attached to an iSCSI storage array.The storage arrays contain external customer financial and medical records used by company'sinvestment and medical services division.The design must:Protect the company's existing data center investmentExpand to a second data center siteIntroduce process automationExpand to and fail over to public cloudWhich two non-functional requirements are applicable for this design? (Choose two.)
Question5: A customer wants to make its data available with a RPO of 10 minutes. Replication to the second data center will be done using the network. Which type of storage configuration should be used?
Question6: A customer has requested a vSphere 6.5 deployment design where ESXi hosts are provisioned with Auto Deploy. The customer requires that certificates can be automatically refreshed and renewed from the vSphere Web Client for ESXi hosts.Which certificate policy should be configured for vCenter Server?
Question7: A solution architect has finished conducting interviews and gathering requirement for a company, and has determined that the logical requirements are:Two data centers for high availabilitySynchronous replication to meet the zero-minute PROSeparating management workloads from application workloadsDedicated 10Gb uplink for each low latency serverSingle management point for the entire environmentWhich two actions would meet the design requirements? (Choose two.)
Question8: A company has requested a new vSphere 6.5 design that will allow it to finally break the 80 virtualization barrier by virtualizing its resource-intensive application.The application is highly available by design and includes application-aware clustering softwarecapable of operating as a fully distributed system.The company's Application Version 2.0 consists of 386 small applications and middleware with non-persistent storage and 24 database virtual machines at each data center.When coupled with a proper load balancing solution, this application can continue operating even withthe loss of an entire data center, but the small applications and middleware tiers within a data center must exist within the same broadcast domain.The database tier is tightly controlled with a firewall policy that only allows middleware tier access, andis replicated to other sites using a dedicated circuit.Which two application requirements apply to this scenario? (Choose two.)
Question9: A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information.The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and inproduction prior to that.The new servers have a 90-day delivery time.A data center for disaster recovery has been selected, and it is 20 miles away and connected by MPLS.The security team will continue to utilize its current investments and VM Encryption for the newenvironment.The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplicationration for backups.Based on the information obtained, which two statements are risks for the new design? (Choose two.)
Question10: View the exhibit.Referring to the exhibit, which appliance or device belongs in the square with the question mark?
Question11: A developer is tasked with building an application to process shipping requests. The developer is consulting the vSphere team to determine failover options and performance best practices.The development team is providing three physical ESXi hosts with 8 CPU cores and 256GB of RAMper host.The developer does NOT know how many virtual machines they will require.Which virtual machine (VM) sizing strategy will provide the highest level of uptime, individual VM performance, and failover capacity?
Question12: A customer is using blade servers with only one HBA.Which two design concepts apply to this scenario? (Choose two.)
Question13: A company's CTO is very concerned about web server outages that are caused by server hardware failures.Which feature can protect the web server virtual machine from this kind of outage?
Question14: A company is conducting a technology refresh and has requested assistance with a vSphere 6.5 design.The company has a corporate headquarters and two data centers strategically placed around thecountry, which provide the bulk of the computer power and storage for their customer-facing stores.The company requires each of its stores to be able to operate independently if connectivity is ever lost.Presently, all stores are configured differently and must be standardized as part of the technologyrefresh.To support store operations, only a dozen applications are required.Any downtime during store hours could result in significant losses.Any proposed design must minimize cost.What is a VMware-recommended option for this scenario?
Question15: A customer is deploying a mission-critical Oracle database with high SLA requirements, including high performance and high availability. The customer has chosen to purchase an All-Flash vSAN solution.Which three storage policies should be used? (Choose three.)
Question16: A virtualization administrator has been tasked with migrating several business applications from physical to virtual. The administrator must also migrate the virtual machines from VMware Workstation to vSphere 6.5, using vCenter Converter Standalone 6.1.In this scenario, which two source types are supported? (Choose two.)
Question17: A company has requested assistance with a new cross-site failover design to support business-critical applications.It has two sites which are very well-connected, and latency is less than 5ms round trip.The customer requires that its applications be restarted even in the event of a total site failure.The applications must be kept online even when migrated during maintenance.Storage arrays at either site support both synchronous and asynchronous replication.Which two options are accurate application requirements for this scenario? (Choose two.)
Question18: A business organization has different types of network traffic, and all the types of traffic must be kept separated. The design architect knows that the number of required networks is greater that the number of physical ports in the system.Which three choices can the architect use to keep the traffic separated? (Choose three.)
Question19: A customer has these requirements for storage:Protocol used must have a file based access.Protocol used must have built in native multipathing.Protocol used must support authentication.To meet these requirements, which protocol should be used for storage?
Question20: A solution architect has been tasked with designing a new environment that meets the needs of a growing company, and has obtained this information.The current capacity will be exhausted in 180 days, and the new infrastructure must be deployed and inproduction prior to that.The new servers have a 90-day delivery time.A data center for disaster recovery has been selected, and it us 20 miles away and connected byMPLS.The security team will continue to utilize its current investments and VM Encryption for the newenvironment.The backup team currently uses Data Domain, and reports show an 8:1 compression and deduplicationratio for backups.Based on the information obtained, which two statements are assumptions for the new design? (Choose two.)
Question21: After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?
Question22: A customer is using a vSphere APIs for Storage Awareness (VASA) compatible storage array. The VASA provider is published as a virtual appliance.To ensure recoverability, where must the VASA provider and vCenter server virtual machines be stored?
Question23: A customer is virtualizing a mission-critical Microsoft SQL database and needs a configuration that provides optimal NUMA performance.There are two possible clusters that the database virtual machine could reside in Cluster A is vSphere6.0 and Cluster B is vSphere 6.5.All ESXi hosts contain dual Intel Xeon E5-2650 processors (ie:2 socket, 10 cores per socket) and256Gb RAM with vNUMA in its default configuration.Given this scenario, which three statements are true? (Choose three.)
Question24: The hardware operations team is planning to purchase new ESXi hosts for the upcoming budget year and is requesting recommendations on the type of servers to purchase for a web application. The web application consists of hundreds of small virtual machines (1 vCPU and 8GB of RAM) that are members of a software cluster.The solution should have these abilities:Recover from ESXi host hardware failuresZero downtime for a limited number of critical virtual machines (VMs)Migrate running VMs between ESXi hosts without interruption to the operating systemPerform these functions using VMware ESXi servers, vCenter Server, and high-speed networkinterfacesWhat are the three functional requirements and their associated VMware technologies? (Choose three.)
Question25: A company provides critical financial and statistical data for several major banks:The company ensures that the bank's customer data is secure and that analytics data is available whenneeded.Customers rely on this data before making crucial business and financial decisions.Just a few minutes of downtime can result in loss of revenue and trust.To meet high-availability requirements, the company's IT infrastructure components must be redundant.The company established three data centers across the global and interconnected them with high-speed WAN links.Due to the rapid growth of its customers and their increasing demands, the compute, network, andstorage were procured and managed by the company's enterprise system administrators group.What are its two key challenges? (Choose two.)
Question26: A company is designing a new vSphere cluster to support a mission-critical application.The application requires 100% availability and cannot be restarted to recover from an ESXi host failure.The application consists of a group of 16 virtual machines, each with 8 vCPU configured.Which solution satisfies the availability requirements?